Biggest News aggregator with 200 million news articles | vimarsana.com

alternate pressurization system the investigation is going to have to decide whether that is completely unrelated. or, whether that was a warning sign of a impending structural failure. >> so not necessarily a signal to the pilot on this point? >> it's a signal that means something is going wrong with the plane, but i do not think there is enough information that would have led them to this door because this door has not been a problem in the past. it has not been a problem with the prior version of the 7:37. so, the big question is going to be, how did they have a successful fleet in the 737 900 that extended range version of the 7:37 and suddenly having all of these problems in the max, that's going to be a big part of the investigation. >> you've got a very serious cases. is boeing liable to legal action? >> boeing certainly is, the chairperson of the ntsb talked about the emotional impact on the passengers. some of the passengers are physically injured, but

Related Keywords

Point , Investigation , Signal , Warning Sign , Pilot , Failure , Pressurization System , Door , Something , Plane , Problem , Version , The Big Question , Information , Led , 37 , 7 , All , Problems , Fleet , 737 900 , Part , Passengers , Cases , Action , Impact , Some , Boeing , Ntsb , Chairperson , Max ,

© 2024 Vimarsana