KPIX KPIX 5 News At 600PM October 25, 2017
And setting it up again. With a long tunnel Boring Machine, you can just keep going. It may take a long time, but it can be cheaper because you arent assembling and disassembling the tunnel Boring Machine again and again. Reporter prep work has already begun with geologists gathering samples deep underground by the plan route. Engineers will get a sense of the rocks below the surface allowing them to better estimate the total cost and speaking of cost, the gilroy chowchilla section was budgeted for 5. 5 billion, but the l. A. Times published an analysis saying a 13. 5mile tunnel could make or ...