Presentation and then get back to it. Let me continue to address other primary concerns brought up today. We want to be clear the current design of the proposed project does not include a basement level for the proposed building. The geotechnical report and supplement analysis may reflect iterations of the proposed project including a basement level. This could be confusing as no longer considerations no longer apply as the building will be built at grade. In described in the cpe its only excavating about four feet below Ground Surface. The geotechnical investigation found ground water at 11 t...