SFGTV July 14, 2013
Difficult because changing the quality of material or going with concrete floor instead of another floor incrementally in the big picture dont have a large impact. We do have a lot of alternatives within the package but the first 5 packages were going to trigger a lot of the costs. So thats one reason as an example the ceiling underneath the throughout the Transit Center but at the ground level were originally g f r. C. But the design team a redesigning those to reduce the costs of that element of construction which is about 3 hundred and 50 thousand square feet of material by 20 to 25 percent...