With the with the building inspectors. The design process that was implemented was very thorough and complete and compasses a complete review. We required that the owner retain technical consultants and geefts as well as the structural jerry. The plan was checked on two cargos. My objections are that while the design was thorough and complete the implementation of the design failed. It didnt meet the intent of the design. My observations are that the requirement of the special inspection when were part of the permit process could have been performed more thoroughly. I would encourage this comm...