KNTV NBC Bay Area News At 6 August 30, 2015
That being from anza to broadway from 10 00 p. M. Tomorrow night to 4 00 a. M. Something to keep in mind. According to pg e about, 9 30, a Third Party Contractor for caltrans working on the broadway inchange with an excavator hit a high voltage tower. It collapsed. 101 was shut down. Huge backup. Traffic had to be rerouted as pg e worked on the repair. There is a lot more going. On significantly more power going through lines. Thats why it was such a complicated process to do so. To make the safe and do so well. Now, that broken power was lifted up out of its position late this afternoon. One ...