KNTV Today In The Bay September 5, 2017
Cleanup from that over the weekend track maintenance. Everything should be running now. Caltrain running slow, very slow past the scene of a deadly crash. Pete suratos continues to be there gathering details between the redwood city station and the palo alto station. This does not affect el camino or wood side. Were looking at a smooth flow of traffic on the major roadways as well. The build through hayward. We have the metering lights on and a disabled vehicle and a crash earlier at carlton causing slowing for the upper east shore freeway. Back to you. Thanks so much, mike. 6 01 and live to w...